PROJECTS :: CASE STUDY 1
Overview   01   02   03   04   05   06   07   08   09

ENGINEERING 
 
Carleton College, Campus Electrical Distribution Upgrade – Northfield, MN 
Sebesta Blomberg was retained by Carleton College to upgrade the campus’ unreliable electrical distribution system. A condition assessment revealed that the cost to replace the electrical distribution system components equaled the cost of a complete system replacement.  
 
As a result of Sebesta Blomberg’s analysis, Carlton College contracted Sebesta Blomberg to design a modern campus electrical distribution that would be reliable, maintainable and meet future campus growth.  
 
Carleton College then hired Sebesta Blomberg to manage the construction of the campus electrical distribution system. This construction project was designed in two phases to sustain campus operations and appear seamless to the college community.  
 
 
 
  CASE STUDIES ::  
Sebesta Blomberg was retained by Arizona Public Service to develop a conceptual solution for the production of biogas 
from cattle manure, the conversion of biogas to electricity, as well as the treatment and processing of resulting waste products. 
 
Sebesta Blomberg has been a valued provider for Mayo Clinic since 1994, providing complete mechanical and electrical design, facility remodeling and utility infrastructure. 
 
Sebesta Blomberg was retained by General Motors to provide mechanical and control systems commissioning documentation services to the multi-phased complete renovation of the 5.5 million square-foot Renaissance Center in Detroit. 
 
Sebesta Blomberg was contracted to design the commissioning project plan as well as perform a technical and economic evaluation of the utility plant and utility operations serving the United States Capitol complex.  
 
Sebesta Blomberg continues to provide electric utilities, utility infrastructure, substation design and power plant design services for dozens of Minnesota Power projects. 
 
Sebesta Blomberg was awarded a LEED® for Existing Buildings Silver level certification by successfully achieving 41 points. 
 
Sebesta Blomberg was retained for a chilled water system improvement project that would dramatically reduce energy costs for a pharmaceutical plant in Northridge, California.  
 
Sebesta Blomberg developed and implemented a Commissioning Program involving over 23 projects. 
 
Sebesta Blomberg is serving as the Commissioning Specialist for the Pentagon Renovation & Construction Program, scheduled for completion in 2010. 
 
Sebesta Blomberg is providing commissioning services for both the Coffee Creek Correctional Facility and the Two Rivers Correctional Institute. 
 
Sebesta Blomberg implemented a combined heat-and-power energy system fueled completely by a local source of biomass fuel.  
 
Sebesta Blomberg was retained to complete mechanical and electrical construction documents for the 113,00 square-foot Target Wing addition.   
 
Sebesta Blomberg established its Asia/Pacific regional offices in 1998, providing an array of services to multi-national companies. 
 