New York Power Authority Headquarters, LEED® Certification – White Plains, NY 
The New York Power Authority has continued to look for new opportunities to improve property performance through energy conservation, recycling, improved air quality, water conservation and other environmentally-sustaining enhancements. Sebesta Blomberg was retained to facilitate the LEED® for Existing Buildings process. With Sebesta Blomberg’s guidance, the 420,000-square-foot, 17-story Clarence Rappleyea Building achieved a Gold Level certification.  
 
Sebesta Blomberg is also providing a series of training sessions on Implementing Sustainable Operations and Maintenance Practices using the LEED® for Existing Buildings as a framework to both Authority staff and the constituents they serve, including the New York State Office of General Services, State University of New York System, New York City Transit Authority, New York City Housing Authority, City University of New York, and other state and county government agencies. 
 
 
  CASE STUDIES ::  
Sebesta Blomberg was retained by Arizona Public Service to develop a conceptual solution for the production of biogas 
from cattle manure, the conversion of biogas to electricity, as well as the treatment and processing of resulting waste products. 
 
Sebesta Blomberg has been a valued provider for Mayo Clinic since 1994, providing complete mechanical and electrical design, facility remodeling and utility infrastructure. 
 
Sebesta Blomberg was retained by General Motors to provide mechanical and control systems commissioning documentation services to the multi-phased complete renovation of the 5.5 million square-foot Renaissance Center in Detroit. 
 
Sebesta Blomberg was contracted to design the commissioning project plan as well as perform a technical and economic evaluation of the utility plant and utility operations serving the United States Capitol complex.  
 
Sebesta Blomberg continues to provide electric utilities, utility infrastructure, substation design and power plant design services for dozens of Minnesota Power projects. 
 
Sebesta Blomberg was awarded a LEED® for Existing Buildings Silver level certification by successfully achieving 41 points. 
 
Sebesta Blomberg was retained for a chilled water system improvement project that would dramatically reduce energy costs for a pharmaceutical plant in Northridge, California.  
 
Sebesta Blomberg developed and implemented a Commissioning Program involving over 23 projects. 
 
Sebesta Blomberg is serving as the Commissioning Specialist for the Pentagon Renovation & Construction Program, scheduled for completion in 2010. 
 
Sebesta Blomberg is providing commissioning services for both the Coffee Creek Correctional Facility and the Two Rivers Correctional Institute. 
 
Sebesta Blomberg implemented a combined heat-and-power energy system fueled completely by a local source of biomass fuel.  
 
Sebesta Blomberg was retained to complete mechanical and electrical construction documents for the 113,00 square-foot Target Wing addition.   
 
Sebesta Blomberg established its Asia/Pacific regional offices in 1998, providing an array of services to multi-national companies. 
 