Sebesta Blomberg - Professional EngineeringSebesta Blomberg
ABOUT
SERVICES
MARKETS
CASE STUDIES
NEWS AND EVENTS
DOWNLOADS
CAREERS
CONTACT
CLIENT TOOLS
CONTACT INFO
HEADQUATERS
2381 Rosegate
Roseville, MN 55113
877.706.6858

info@sebesta.com
 

EMPLOYEES
PRIVACY POLICY
PROJECTS :: CASE STUDY 8
Overview   01   02   03   04   05   06   07   08   09

CENTRAL PLANT 
 
Brandeis University, Utility Master Planning Energy Analysis Design and Construction – Boston, MA 
Sebesta Blomberg was retained by Brandeis to conceptualize and implement a multi-phased utility infrastructure renewal program. The project began with a master plan that started with assessing the condition and performance of the existing utility systems, analyzing the data and developing recommendations for implementation. 
 
Sebesta Blomberg surveyed the campus central steam generation and distribution system, reviewed design documentation and collected and reviewed plant operational and fuel consumption data. Through this process, Sebesta Blomberg developed a recommended system upgrade program. 
 
It was determined that due to campus load growth; the electric service available to the campus from their electric utility had no capacity for future growth. Additional upgrades were also required, including replacing selected transformers and switches, installing new cable and cable ties, key interlock systems, sub-metering and power factor correction capacitors. 
 
 
 
 
 
  CASE STUDIES ::  
Sebesta Blomberg was retained by Arizona Public Service to develop a conceptual solution for the production of biogas 
from cattle manure, the conversion of biogas to electricity, as well as the treatment and processing of resulting waste products. 
 
Sebesta Blomberg has been a valued provider for Mayo Clinic since 1994, providing complete mechanical and electrical design, facility remodeling and utility infrastructure. 
 
Sebesta Blomberg was retained by General Motors to provide mechanical and control systems commissioning documentation services to the multi-phased complete renovation of the 5.5 million square-foot Renaissance Center in Detroit. 
 
Sebesta Blomberg was contracted to design the commissioning project plan as well as perform a technical and economic evaluation of the utility plant and utility operations serving the United States Capitol complex.  
 
Sebesta Blomberg continues to provide electric utilities, utility infrastructure, substation design and power plant design services for dozens of Minnesota Power projects. 
 
Sebesta Blomberg was awarded a LEED® for Existing Buildings Silver level certification by successfully achieving 41 points. 
 
Sebesta Blomberg was retained for a chilled water system improvement project that would dramatically reduce energy costs for a pharmaceutical plant in Northridge, California.  
 
Sebesta Blomberg developed and implemented a Commissioning Program involving over 23 projects. 
 
Sebesta Blomberg is serving as the Commissioning Specialist for the Pentagon Renovation & Construction Program, scheduled for completion in 2010. 
 
Sebesta Blomberg is providing commissioning services for both the Coffee Creek Correctional Facility and the Two Rivers Correctional Institute. 
 
Sebesta Blomberg implemented a combined heat-and-power energy system fueled completely by a local source of biomass fuel.  
 
Sebesta Blomberg was retained to complete mechanical and electrical construction documents for the 113,00 square-foot Target Wing addition.   
 
Sebesta Blomberg established its Asia/Pacific regional offices in 1998, providing an array of services to multi-national companies. 
 
FLASH SITE Copyright © Sebesta Blomberg