PCC :: CLIMATE ACTION PLAN
Energy Assessments 
  • Conduct ASHRAE Level I, II, and III audits for facilities.
  • Compile energy and cost data for facilities and make recommendations for short-term and long-term improvements.
  •  
    Stakeholder Facilitation 
  • Act as a third party facilitator to gather qualitative and quantitative data from key stakeholder groups.
  • Conduct on-site and off-site meetings with sustainability teams to identify common goals and areas of interest.
  •  
    Climate Action Plan Development 
  • Gather information from campus stakeholders to develop baseline, set targets, and recommend implementation strategies for achieving goals.
  • Draft Climate Action Plan for key constituent review.
  •  
    Water Use Assessments 
  • Analyze water use to determine areas for resource savings and potential payback.
  •  
    Waste Assessments 
  • Study waste patterns to determine areas for improved waste reduction, resource reuse, and increased recycling.
  •  
    Renewable Energy Feasibility 
  • Conduct feasibility studies for on-site and off-site renewable energy generation including cost, benefit, and payback.
  • Provide design services for renewable energy systems including solar, wind, biomass, and geothermal.
  •  
    View Case Studies 

     

     

     

    DOWNLOAD ::
    Commercial Engineering
    CASE STUDY BRIEF::
    Williams College 
    In 2007, Williams College committed to a goal of reducing its greenhouse gas emissions to 10% below 1990-1991 levels by 2020. Sebesta Blomberg developed a five-year master plan for campus energy and 
    greenhouse gas management. The scope included a full energy assessment of 20 facilities with 
    abbreviated scoping surveys of 60 buildings. The services included the integration of prior 
    retrocommissioning studies, thus the master plan encompassed the entire campus. Nearly 50 separate 
    areas of opportunity were identified, including operational enhancements, lighting conversions, controls upgrades and HVAC renovations. The master also addressed related longer term building issues, 
    including connection to central utilities, distribution piping, electric building heating and obsolete windows. Renewable energy options were also including in the master plan. Sebesta Blomberg assisted 
    with implementing the recommendations including detailed engineering, commissioning and savings 
    verification services. 